Comms Room Refit

We all know how difficult it is to keep your Comms Room/Data centre neat and tidy, with accurate records. Often time pressures demand that procedures are short circuited and things get out of hand before you know it.

If the answer to any of the below is YES: 

Does your patch field look like a plate of spaghetti? 

Do you have trouble tracing patch cords?

Are the patch panel and switch ports obstructed?

Do you have hot/cold spots

Are you running out of capacity?

Are your records out of date?

Then sooner or later you will have to spend more money to correct or improve these problems.

Electron’s Comm’s room refits can be tailored to suit your  requirements and budget. Whether an existing room (or a new room), we can design, redesign and adapt any size of Comms room.  From a simple re-patching and/or auditing exercise to a full overhaul with a new layout of open racks (as shown below), cabinets and management.

Before

Comms Room Refit Before

After

Comms Room Refit After

Having carried out hundreds of successful Comms room refits over the last 15 years, we have a proven track record in delivering these rooms with minimal disruption to the clients business. 

A Comm’s room re-fit is carried out in a 5 step process

Step 1 – FREE site survey following initial telephone conversation.

Step 2 – Identification and tagging of all equipment and cables within the cabinet(s).

Step 3 – Out of hours removal of equipment and cables from cabinet(s).

Step 4 – Mounting of new cabinet(s) or open frame(s), refitting of cables and equipment.

Step 5 – Re-patching of equipment with complete document pack.

With vast experience and expertise in Comms room developments, Electron has many space saving ideas to alleviate congestion of patch cables, create additional rack ‘U’ space and alleviate hot spots.

By the time we’ve finished you will have a tidy and comprehensive Comms Room that you can be proud of.

Get In Touch